• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Careers
  • Employee Portal
  • Service Portal

Call Now (757) 428-4646

Thermo-Trol Systems

Thermo-Trol Systems

  • Who We Are
    • Executive Team
    • Timeline
  • What We Do
    • Building Automation
    • Service of HVAC and Control Systems
    • UL 508a Control Panels
    • Industrial Controls & SCADA
    • Systems Integration
    • Enterprise Solutions
    • Dashboarding and Analytics
    • Custom Engraving / Tags
    • Training
  • Product Partners
  • Capabilities
    • Vertical Markets
    • Design Build Team
    • Specification Development
    • Cybersecurity
    • Facility Optimization / BAS Consultation
    • Accolades / Testimonials
  • Projects
  • Financing
  • E-Parts
  • News
  • Contact

Half Moon Cruise Terminal

Recreation

Half Moon Cruise Terminal

by

Thermo-Trol Systems installed ALC Controls at the Norfolk Cruise Terminal. This was unique because it utilized river water for heat transfer, making this an environmentally friendly cooling system.

VA Aquarium

by

Thermo-Trol Systems successfully installed Automated Logic Controls in half of the building. This building is unique in the fact that we integrated all the controls into both the WebCtrl and Johnson Controls front-end.

US Wildlife Game and Fish Chincoteague

by

Thermo-Trol Systems installed a BACnet solution in the existing facility. The existing staff was unable to maintain the previous control system. Thermo-Trol Systems partnered with the agency and its local engineering office to develop a cost effective user friendly solution. Automated Logic was installed and the agency’s personnel were trained at our training center.

Footer

LinkedIn
  • Call Now (757) 428-4646
  • Careers
  • Employee Portal

Copyright © 2023 Thermo-Trol Systems · Privacy Policy